The Blind Wolf Posted March 8, 2021 Share Posted March 8, 2021 Sid, just a thought. Watching the Live show from Sean tonight, I thought of something about the charger pushing the GS inverter DC charging. Why not come out with a GS DC Charger, that works along side the GS wifi line up. One that can be used to take 120v or 240v and charge the bank and provide the needed power during a high load would trigger the Generator to kick on and provide the extra power to the GS inverters while keeping the batteries stable. Just a thought of a add on. 1 Quote Link to comment Share on other sites More sharing options...
Waterman Posted March 8, 2021 Share Posted March 8, 2021 I'm building one currently out of a PJ unit. It will have the original fan and temp controls and the transformer. As it was a 6K unit, I figure running it at 2K max will be fine. It is an ASL-1 transformer so I'll split the what used to be primary and feed it to 6 50 Amp full wave bridge rectifiers. The outputs of pairs of them will be joined in series so that they will put out about 50 VDC and then feed that to a MakeSkyBlue controller. Quote Link to comment Share on other sites More sharing options...
The Blind Wolf Posted March 8, 2021 Author Share Posted March 8, 2021 19 minutes ago, Waterman said: I'm building one currently out of a PJ unit. It will have the original fan and temp controls and the transformer. As it was a 6K unit, I figure running it at 2K max will be fine. It is an ASL-1 transformer so I'll split the what used to be primary and feed it to 6 50 Amp full wave bridge rectifiers. The outputs of pairs of them will be joined in series so that they will put out about 50 VDC and then feed that to a MakeSkyBlue controller. Thats all good, but, not everybody knows how to build those 😛 and I'm not going to try, unless I'm shown hands on. and besides that, I can't do that to my current pj cause its a 12v I need a 24v, and the biggest 24v charger I got is 10 amp and a 4A charger. Quote Link to comment Share on other sites More sharing options...
Bwicked007 Posted October 27, 2021 Share Posted October 27, 2021 (edited) Sorry to bring this back to life but I would like to see this aswell. Like the mpp inverter, I know gs already beats it by true output but if can figure out a hybrid inverter setup all in one unit.( were the panels hook straight up to charge or gti Edited October 27, 2021 by Bwicked007 Quote Link to comment Share on other sites More sharing options...
Bwicked007 Posted October 27, 2021 Share Posted October 27, 2021 Quote Link to comment Share on other sites More sharing options...
Sid Genetry Solar Posted October 27, 2021 Share Posted October 27, 2021 On 3/7/2021 at 11:01 PM, The Blind Wolf said: Sid, just a thought. Watching the Live show from Sean tonight, I thought of something about the charger pushing the GS inverter DC charging. Why not come out with a GS DC Charger, that works along side the GS wifi line up. One that can be used to take 120v or 240v and charge the bank and provide the needed power during a high load would trigger the Generator to kick on and provide the extra power to the GS inverters while keeping the batteries stable. Just a thought of a add on. I must have completely lost notification of this topic... This is known as the "charge" function that is a stock feature in a GS inverter (including 2-channel generator start also built in). Yes, the entire inverter load will be transferred to the AC input--but it is pointless to try to "charge" your battery bank if the charging power source can't handle the entire inverter load. If the charge source can't offset the entire load, you'll still be in deficit, albeit at a slower pace. 2 hours ago, Bwicked007 said: Sorry to bring this back to life but I would like to see this aswell. Like the mpp inverter, I know gs already beats it by true output but if can figure out a hybrid inverter setup all in one unit.( were the panels hook straight up to charge or gti Completely different request than the O.P., but increasingly common. Several major problems: It's taken 2 years to get the GS inverter to where it is. I really don't want to reinvent the wheel if I don't have to (i.e. designing an MPPT), when there are viable options currently on the market. It will not be a "Free" addon. The inverter cost will have to go up significantly for the added equipment--otherwise we go bankrupt. I like to make things small. There is barely room in the GS 6k chassis for any addons (because of the size of the transformer)...and there is NOT room in the 12kw GS inverter for addons. If I should design and add an MPPT input to a GS inverter...it would have to be able to support the entire wattage of the inverter (i.e. 6kw MPPT in on a 6kw GS.) This is far easier said than done, especially as GS 6kw inverters can be configured for 12, 24, 36, 48v input. Amperage is the killer in every case--and that would require an MPPT that can handle over 500A @ 12v. You won't find an MPPT that can come close to even half of this amperage that will fit inside the chassis. Not to mention the heat generated. If the MPPT can't handle the full wattage, you end up having to add external MPPTs to make up the difference. Suddenly there's 2 different technologies at play here, and getting them to work together is a pain. I know: I have 2 different kinds of MPPTs on my solar system (Morningstar Tristar and Epever Tracer). Peanut gallery says, "I can't figure out why you don't just 'add an MPPT to the inverter'." The reason being that it's a whole lot more complicated than "just add something." Design, testing, engineering, programming...all of that takes a significant amount of time and money. And right now I really don't have either. I've considered off-the-shelf boards, but can't find any of those either. 1 Quote Link to comment Share on other sites More sharing options...
dickson Posted October 28, 2021 Share Posted October 28, 2021 The reason being that it's a whole lot more complicated than "just add something." Design, testing, engineering, programming...all of that takes a significant amount of time and money. And right now I really don't have either. I work in manufacturing and it is very hard when the sales department sell somthing and not realize the item can not be made at that price or sometime it can not be made at all and the fighting continue . I think the GS 12kw need to be done as soon as possible as the testing is taking a lot of time for 2 people . Quote Link to comment Share on other sites More sharing options...
Sid Genetry Solar Posted October 28, 2021 Share Posted October 28, 2021 9 hours ago, dickson said: I think the GS 12kw need to be done as soon as possible as the testing is taking a lot of time for 2 people . Honestly right now the 12kw is "backburnered"...simply because there's only so much 2 people can do at a time. I've spent the past few days soldering, programming and testing Rev. C boards to ship out to Sean for customers that are waiting on 6k inverters w/ C boards in them. Plus code work, oh, and more WiFi boards.... ...there's only so much 2 people can do. With Sean having fractured his ankle this past week, that really didn't help anything. Quote Link to comment Share on other sites More sharing options...
dickson Posted October 28, 2021 Share Posted October 28, 2021 there's only so much 2 people can do. With Sean having fractured his ankle this past week, that really didn't help anything. I saw the youtube video and look bad and may need surgery . Bad time for this to happen when everything seem to be doing good . Hope he get well soon. Quote Link to comment Share on other sites More sharing options...
Sid Genetry Solar Posted October 28, 2021 Share Posted October 28, 2021 1 hour ago, dickson said: I saw the youtube video and look bad and may need surgery . Bad time for this to happen when everything seem to be doing good . Hope he get well soon. Nah, just a boot to keep the foot immobile and 6 weeks. 1 Quote Link to comment Share on other sites More sharing options...
Bwicked007 Posted October 28, 2021 Share Posted October 28, 2021 Yeah I forgot about that. Continue the great work guys! & I wouldn’t mind taking an application for a J.O.B.😁 Quote Link to comment Share on other sites More sharing options...
Sid Genetry Solar Posted October 28, 2021 Share Posted October 28, 2021 1 hour ago, Bwicked007 said: Yeah I forgot about that. Continue the great work guys! & I wouldn’t mind taking an application for a J.O.B.😁 Seems that everyone thinks "business = lots of money floating around." I wish it worked that way. ...Sean's staying afloat because his wife's job. ...and I'm staying afloat through a combination of being frugal AND working with a local contractor to reroof houses / lots of misc odds and ends. At least right now R&D is consuming pretty much all of the "profit" we might've made on selling inverters. There's work to be done, for sure...just not money in said work to pay any bills. Quote Link to comment Share on other sites More sharing options...
Bwicked007 Posted October 29, 2021 Share Posted October 29, 2021 19 hours ago, Sid Genetry Solar said: Seems that everyone thinks "business = lots of money floating around." I wish it worked that way. ...Sean's staying afloat because his wife's job. ...and I'm staying afloat through a combination of being frugal AND working with a local contractor to reroof houses / lots of misc odds and ends. At least right now R&D is consuming pretty much all of the "profit" we might've made on selling inverters. There's work to be done, for sure...just not money in said work to pay any bills. Sent you a msg Sid. Not looking for money I have enough with current job. Quote Link to comment Share on other sites More sharing options...